After thinkering with the website for a while I’ve decided to go live with a Alfa (or perhaps I’m over in Beta-stage by now?) version. A few things will change during the next few weeks/months. Most importantly the pages will have an image gallery soon.

During the first two months of 2007 a lot of really neat things have happened in the shop. First of all I’ve managed to finish two front triangles. A detail shot of one of ’em can be seen on the front page. Hopefully these frames should be done in a week or so. But the most thrilling thing that happened was that I received a full toolkit from Anvil Bikes. Tools in this regards means frame fixture, fork fixture and a full set of mitering fixtures for precision cutting of frame tubing. To say that I was thrilled would be a true understatement. Here’s a few pictures:

Like this post1
Go top